In order for the PLLE2 to generate the 6.25% duty cycle on the sync pulse, the frequency must not be lower than 200 MHz.
The minimum frequency is scheduled to be set to 200 MHz in the MIG 7 Series GUI (starting with the ISE 13.2 software release).
Answer Number | 问答标题 | 问题版本 | 已解决问题的版本 |
---|---|---|---|
40050 | MIG 7 Series v1.1 - Release Notes and Known Issues for ISE Design Suite 13.1 | N/A | N/A |
AR# 40871 | |
---|---|
日期 | 08/26/2014 |
状态 | Active |
Type | 已知问题 |
器件 | |
IP |