AR# 42151

|

13.1 PlanAhead - Timing Report Shows the Failing Path with a Skew in ms Instead of ns

描述

TheTiming report in the PlanAhead tool showsthe failing path with a skew from ns to ms, for example,

The Timing report shows:

Skew -0.168ns (1.273ns - 1.441ms)

The TRCE report shows:

Clock Path Skew: -0.168ns (1.273 - 1.441)

解决方案

This isssue is fixed in the 13.2 PlanAhead tool.
AR# 42151
日期 05/19/2012
状态 Archive
Type 已知问题
器件
Tools
People Also Viewed